https://www.americancityandcounty.com/wp-content/themes/acc_child/assets/images/logo/footer-logo.png
  • Home
  • Co-op Solutions
  • Hybrid Work
  • Commentaries
  • News
  • In-Depth
  • Multimedia
    • Back
    • Podcast
  • Resources & Events
    • Back
    • Resources
    • Webinars
    • White Papers
    • IWCE 2022
    • How to Contribute
    • Municipal Cost Index – Archive
    • Equipment Watch Page
    • American City & County Awards
  • About Us
    • Back
    • About Us
    • Contact Us
    • Advertise
    • Privacy Statement
    • Terms of Service
American City and County
  • NEWSLETTER
  • Home
  • Co-op Solutions
  • Hybrid Work
  • Commentaries
  • News
  • In-Depth
  • Multimedia
    • Back
    • Podcasts
  • Resources/Events
    • Back
    • Webinars
    • White Papers/eBooks
    • IWCE 2022
    • How to Contribute
    • American City & County Awards
    • Municipal Cost Index
    • Equipment Watch Page
  • About Us
    • Back
    • About Us
    • Contact Us
    • Advertise
    • Cookie Policy
    • Privacy Stament
    • Terms of Service
  • newsletter
  • Administration
  • Economy & Finance
  • Procurement
  • Public Safety
  • Public Works & Utilities
  • Smart Cities & Technology
  • Magazine
acc.com

Bridge modernization

Bridge modernization

  • Written by rodwellj
  • 20th September 2018


Bridge modernization

Chesapeake, Va.

Completed in November 2016, Chesapeake, Va.’s Dominion Boulevard Improvement Project was the largest locally administered project in the state’s history. The project was one of the first to use the funds from the Virginia Transportation Infrastructure Bank (VTIB) Loan Program. It was completed approximately $20 million under budget and five months before its contractual completion date.

Dominion Boulevard is a portion of U.S. Route 17, which connects Virginia and North Carolina through Virginia Interstates 64 and 464. The boulevard had included the moveable Steel Bridge, which traverses the southern branch of the Elizabeth River in Chesapeake. With 33,000 daily vehicles traveling on a two-lane road rife with heavy truck traffic, Dominion Boulevard was also heavily congested. Moreover, the Steel Bridge’s lift times equated to it being closed 42 days per year. The stretch’s unreliability as a hurricane escape route coupled with a high accident rate compounded concerns.

Tolls — which would contribute 40 percent of the project’s funding — were instated in the early 2000s. In 2011, the VTIB was established to provide low interest loans for financing high priority transportation projects. Desiring the lowest tolls possible, Chesapeake qualified for the first VTIB loan in January 2012, which provided nearly $152 million in funding. Federal and state funds as well as existing reserves and earnings financed the remainder. A team of four companies formed to handle construction, which began in January 2013.

By October, some traffic had been diverted to a long-term detour running parallel to Dominion Boulevard, and the Steel Bridge was demolished in January 2015.  During construction, wick drains were installed to encourage soil drainage and a temporary concrete plant was built to make construction more efficient. Throughout the construction process, Chesapeake staff used a digital animation to show motorists and residents the intended goal of the renovations. A dedicated website, social media account and opt-in alert system also provided residents with important information updates.

Ultimately, the project replaced the Steel Bridge with the Veterans’ Bridge, a 95-foot high fixed span bridge with four traffic lanes and a 10-foot bicycle path separated from vehicular traffic. Additionally, it removed stoplights from a three-mile stretch of the Dominion Boulevard roadway and introduced interchanges to parts of the road. The Veterans’ Bridge also has less congestion, an improved hurricane evacuation route and faster public safety response times. It opened to the public in November 2016, and electronic tolling was scheduled to begin in December 2016.

“We’ve had a very positive response from citizens since the opening of the new roadway,” Chesapeake Public Information Coordinator Elizabeth Vaughan says.  “And really, the best response we get is no response at all.  No congestion complaints, no construction complaints, just quick and easy commuting.”

Continued on next page.

Tags:

Related Content

  • Cybersecurity leaders urge digital defense awareness, preparation in light of Russia invasion
  • Bridging the Digital Divide: Powering a Future of Inclusive Connectivity
  • HHS data
    Transforming your HHS agency into a data-first organization
  • How is Automated IT Revolutionizing Government Agencies?

White papers


How to Assemble a Rockstar Website Redesign Steering Committee

7th June 2022

Hand Hygiene: Compliance Matters

23rd May 2022

What it Takes to Build a Winning Esports Program

23rd May 2022
view all

Events


PODCAST


Young Leaders Episode 4 – Cyril Jefferson – City Councilman, High Point, North Carolina

13th October 2020

Young Leaders Episode 3 – Shannon Hardin – City Council President, Columbus, Ohio

27th July 2020

Young Leaders Episode 2 – Christian Williams – Development Services Planner, Goodyear, Ariz.

1st July 2020
view all

Twitter


AmerCityCounty

Supreme Court ruling on EPA greenhouse gas regulation will impact cities dlvr.it/STBwkw

1st July 2022
AmerCityCounty

Sustainability initiatives take center stage in Florida county dlvr.it/STBvwN

1st July 2022
AmerCityCounty

10 best cities for July Fourth celebrations dlvr.it/STBfHt

1st July 2022
AmerCityCounty

The Missing Link in Cloud Security dlvr.it/STBXNL

1st July 2022
AmerCityCounty

Improving Productivity with Employee Engagement | Aug. 4, 2022 at 2 PM ET dlvr.it/STBCD5

1st July 2022
AmerCityCounty

We want to hear from you! Please take this brief survey and let us know how your organization is managing your budg… twitter.com/i/web/status/1…

30th June 2022
AmerCityCounty

Report: Reforming emergency dispatch won’t be easy, but it’s necessary dlvr.it/ST7kQ5

30th June 2022
AmerCityCounty

Three U.S. cities to adopt Bloomberg Philanthropies Mayors Challenge-winning project to combat climate change dlvr.it/ST4bjk

29th June 2022

Newsletters

Sign up for American City & County’s newsletters to receive regular news and information updates about local governments.

Resale Insights Dashboard

The Resale Insights Dashboard provides model-level data for the entire used equipment market to help you save time and money.

Municipal Cost Index

Updated monthly since 1978, our exclusive Municipal Cost Index shows the effects of inflation on the cost of providing municipal services

Media Kit and Advertising

Want to reach our digital audience? Learn more here.

DISCOVER MORE FROM INFORMA TECH

  • IWCE’s Urgent Communications
  • IWCE Expo

WORKING WITH US

  • About Us
  • Contact Us

FOLLOW American City and County ON SOCIAL

  • Privacy
  • CCPA: “Do Not Sell My Data”
  • Cookies Policy
  • Terms
Copyright © 2022 Informa PLC. Informa PLC is registered in England and Wales with company number 8860726 whose registered and Head office is 5 Howick Place, London, SW1P 1WG.
This website uses cookies, including third party ones, to allow for analysis of how people use our website in order to improve your experience and our services. By continuing to use our website, you agree to the use of such cookies. Click here for more information on our Cookie Policy and Privacy Policy.
X