Big leaks at Boston’s Big Dig
The Big Dig highway project in downtown Boston is shot full of leaks that are releasing millions of gallons of water into the $14.6 million tunnel system.
The Big Dig highway project in downtown Boston is shot full of leaks that are releasing millions of gallons of water into the $14.6 million tunnel system. According to the Associated Press, fixing the hundreds of leaks could take up to 10 years. http://www.cnn.com/2004/US/11/10/big.dig.ap/index.html
Tags: